More drama at Callide as workers injured

Unit C3 at Callide C Power Station. the C3 unit was brought offline on Friday after the failure of a battery charger reportedly caused a fire in the switch room, and a contractor was injured in the boiler room in a separate incident. (CS Energy)

Workers have been left rattled after serious safety events at Callide Power Station on Friday, 26 July injured three workers, […]

Subscribe or Login to see the rest of the content.